Concrete Calculator

Work out how much concrete a slab, footing, column, or post hole needs, in cubic yards and in 80, 60, and 40 lb bags.

Try:
ft
ft
in
%

5–10% is typical.

$

Result

Concrete needed: 1.23 yd³

Concrete needed

Cubic feet
33.33 ft³
Cubic meters
0.944 m³
80 lb bags
56
60 lb bags
75
Premixed bags needed (rounded up)
Bag sizeYieldBags
80 lb0.60 ft³56
60 lb0.45 ft³75
40 lb0.30 ft³112
Calculation steps
  1. Volume of one = 10 ft × 10 ft × 4 in = 33.33 ft³
  2. Plus 0% waste = 33.33 ft³
  3. 33.33 ÷ 27 = 1.23 cubic yards

Calculations run in your browser. Your inputs are not sent to our server.

Formula

  • Slab: ft³ = Length × Width × (Thickness in ÷ 12)
  • Round: ft³ = π × (Diameter in ÷ 24)² × Depth
  • Cubic yards = ft³ ÷ 27
  • Bags = ft³ ÷ bag yield, rounded up

How it works

Concrete is ordered by volume. The shape’s volume is found in cubic feet (thickness and diameter are entered in inches, so they are divided by 12), multiplied by the quantity, increased by the waste percentage, and divided by 27 because a cubic yard is 3 × 3 × 3 feet.

Bag counts use the yields printed on common premixed concrete: an 80 lb bag makes about 0.60 cubic feet, a 60 lb bag 0.45, and a 40 lb bag 0.30. Each is rounded up to a whole bag.

Worked examples

10 × 10 patio, 4 inches

33.33 ft³ ÷ 27 = 1.23 yd³, or 56 bags of 80 lb.

Length
10 ft
Width
10 ft
Thickness
4 in
Concrete needed
1.23 yd³

Driveway slab with waste

200 ft³ plus 8% is 216 ft³ = 8 yd³, about $1,200 of ready-mix at $150 a yard.

Length
20 ft
Width
24 ft
Thickness
5 in
Extra for waste and spillage
8 %
Ready-mix price per cubic yard (optional)
$150
Concrete needed
8 yd³

Eight fence post holes

Each 10-inch hole 3 ft deep holds 1.64 ft³; eight hold 13.09 ft³, or 22 bags of 80 lb.

Diameter
10 in
Depth
3 ft
Quantity
8
Concrete needed
0.48 yd³

Limitations and assumptions

  • Only two shapes are supported: rectangular slabs or footings (length × width × thickness) and round columns or post holes (diameter × depth). Steps, stairs, curbs, and tapered footings need to be split into those shapes and added together.
  • Bag counts use typical premixed yields (0.60, 0.45, and 0.30 cubic feet for 80, 60, and 40 lb bags). Check the yield printed on the product you buy, since mixes vary.
  • The ready-mix cost is simply cubic yards × the price you enter. It does not include delivery, short-load fees, pumping, rebar, forms, or tax.

Typical thickness

  • Walkways and patios: 4 in
  • Driveways: 5–6 in
  • Garage floors and heavy loads: 6 in or more
  • Post footings: about 3× the post width in diameter

Bags or a truck?

Mixing more than about one cubic yard by hand means 45 or more 80 lb bags, so ready-mix delivery is usually easier and cheaper above that. Many suppliers have a minimum order or a short-load fee below 3–4 yards; check before you pour.

Subgrade that is uneven or softer than expected eats concrete quickly. The waste allowance covers spillage and minor variation, not a base that is several inches off.